Deployment

From site data to commissioned system.

No mystery, no months of disruption. Kairospace systems are drop-in hardware on your existing lines — here's exactly what happens, in what order, and who does what.

Timeline

What happens when

Week 0 · Analysis

You share flow rate, pipe diameter, water source, and goals. We run root-cause diagnostics and size the system. A written proposal follows in days.

Weeks 1–6 · Engineering & Build

On confirmation, hardware is configured for your line. Typical lead time is 4–6 weeks from down payment to delivery.

Install · Days, Not Weeks

Injectors and cavitators mount inline on your existing piping. Most installs complete in one to three days with minimal downtime on the treated line.

Ongoing · Optimization

Commissioning, operator training, and DO/pH monitoring. Biannual maintenance keeps pumps and O₂ generators at spec — by certified Kairospace technicians.

Responsibilities

Who does what

The split that has worked across our deployments. Simple on purpose.

Kairospace provides

  • System design sized to your flow and goals
  • Hardware: injectors, cavitators, O₂ generation, sensors
  • Delivery, installation, and commissioning
  • Operator training on-site
  • Warranty — 3-yr non-moving / 1-yr moving parts
  • Certified-technician service and replacement parts

Your team provides

  • A dedicated power drop (e.g. 220 V, 30 A GFCI-protected circuit — exact spec in your proposal)
  • Access to the water line or reservoir at the injection point
  • Basic site prep (a pad or mounting area for the skid)
  • An operator contact for training and checkpoints
  • On pilots: shared readings so the results report reflects reality
Project site

Your project, in one place

Every Kairospace project gets a private project site. Access is per project and by invitation — your team, the Kairospace team, and your local partner where one is assigned.

Milestones

Where the project stands, from scope to commissioning, and what comes next.

Documents to review and accept

Proposals and project documents in one place. You accept them on the site, and each acceptance is recorded with a timestamp.

Requests and messages

The questions we need you to answer to size and install the system, and a message thread for everything else.

Readings and maintenance

Once the system runs, readings are plotted against the bands agreed for your site, next to the maintenance schedule.